 |

Brewster Site Remediation & Closure Cytec Industries, Brewster, FL
Brewster is the 1000 acre site of a phosphate chemicals complex that was shut-down in 1971 and is now owned by Cytec Industries. In conjunction with Bromwell & Carrier, Inc, KEMWorks provided special expertise and engineering services for the handling, treatment and eventual discharge of almost 2 billion gallons of acid pond water. KEMWorks personnel were involved in the conceptual design, testing and final engineering of the proposed treatment systems. Extensive interaction with Florida Department of Environmental Protection was required.
|
 |